Construction Photos

 



 


Our new building is really coming along!
For other photographs, please visit the Photo Blog



April 8, 2007

The roof on the tower has been constructed.  Very soon we'll see the entire roof covered with its dark bronze outer shell. 

Some of the Middle School lockers on the 2nd floor.

The kitchen is nearly complete.  Cabinetry has been installed, walls have been painted and flooring has been put down.

The Music Room/Lecture Hall- 2nd floor.  Still needs some work but it's getting there!

Exterior view from the south.

Nurse's Station, just off the main office.  It is much bigger than this picture portrays and has room for a bed. 

One of the girls restrooms - Both boys and girls restrooms have been completed (just neeting a few finishing touches)on the main floor and are nearing completion on the second floor. 

A classroom - most of the classrooms are nearing completion and just needing some final finishing touches. 

Main Office - beautiful wood doors have been installed throughout the school. 

Exterior view from the north 

Inside the Communications Room - the school is being networked for both computer and communications. 

The sinks inside the classrooms are equipped with drinking fountain "bubblers" for convenience. 

Hallways throughout the main floor all have their flooring installed and are painted.
 

 

 



March 9, 2007

Pretty soon our teachers, students and parents will be entering through these doors to go to school!
 

One of the newly installed parking lot lamps in front of the school.

A handful of our dedicated steel crew.  Way to go guys, you've worked hard!

The Teacher's Resource room.  Walls are painted, cabinetry has been installed and the ceiling grid is going in. 

A classroom with its cabinetry and ceiling work. 

A classroom with some cabinetry and ceiling work.  Just a little bit more to go...

Second floor framing.

Second floor, looking into the bell tower.

 



February 23, 2007

It's coming along... 

The tower is done (except the roof)!  We're getting there...

 



February 18, 2007

The tower's going up, and the arched windows are going in.

Teacher's resource room.

Front desk, with Mr. Glathar's and Mrs. Cisneros' offices in the background.

 

Second floor.

Second floor, south wing.

 




January 21, 2007

Kindergarten class.

North wing hallway with the stairs to the 2nd floor at the end.

Stairs to the 2nd floor. 

Wall fencing along the south perimeter of the school grounds.

Inside view of the gymnasium. 

 

Exterior view.  The front is tented to retain heat in preparation for the brick and mortar that will shape the front door/tower.



 

January 12, 2007

Welcome to class!  View of the entrances to classrooms in the south wing.

View through the future computer lab and library towards the framed-in classrooms in the north wing.

Lunchtime!  View of the serving area just off the gymnasium.

View of north wing hallway from the rear of the building.

View of the Kindergarten hall leading out to the Kindergarten playground and north parking lot.

A tractor in our computer lab?  Not for long!  View of the elevator shaft in the background.

It's hard to see with the snow, but those skinny little poles have cement footings beneath them.  Very soon they will hold the pillars for the perimeter wall.

That steelwork is really making progress.  Those vertical steel beams form the peak of the roof behind the front tower.  And let's not forget the windows that have been installed on the first floor.




January 5, 2007

View of the south wing hallway with classroom framing, from the front end of the school.

Another view of the south wing, from the opposite direction.  This is a cross-hallway.  To the left is an exit to the playground, to the right is an entrance to the gymnasium.

View of doorways into classrooms.

View from the gymnasium into the kitchen area.    The large doorways will have roll-up doors to protect the serving area while the gymnasium is in use. 

View of some of the north wing wall framing.

View of the second floor, south wing.  The cement has been poured and workers are now concentrating on the steelwork and welding towards the center front.

View of the second floor toward the north wing.  The cement has been poured and workers are now concentrating on the steelwork and welding above the library.

View from the main entrance toward the eventual main staircase and library.

View of the south-west exterior and front sidewalk.

View of the south-west exterior and border sidewalk. 

 View of the building and parking lot.
 

 


Go to Construction Updates page.